H&H Menifee Concrete WorksH&H Menifee Concrete Works(951) 574-0417

Concrete driveway building in Menifee CA - a driveway built on solid, packed ground

Old driveway cracked, sinking or holding water? We dig out, pack the ground and pour a new slab that drains away from your house.

New light-gray concrete driveway with straight control joints leading to a brick house and white garage door.

What does it take to build a new concrete driveway in Menifee?

Concrete driveway building in Menifee means taking out the old driveway or bare dirt, digging down and packing the ground underneath, then forming, pouring and finishing a new slab that's sloped so water runs away from your house.

Most people call us when the old driveway has cracked through, sunk at one corner or holds a puddle every time it rains, and usually the trouble started under the slab, not on top of it. The price moves with the size, how much old concrete has to come out, how much digging and fill the ground needs and the finish you pick, while the schedule turns on any permit steps, the weather and curing, the wait while new concrete hardens before it takes weight. Your estimate puts a figure on each of those for your driveway.

I learned this trade working next to experienced finishers and got my own state license before starting H&H Menifee Concrete Works in 2017, and driveways are one of the jobs we're best known for.

  • Tear-out and haul-off of the old driveway when there's one coming out.
  • Forms set so the finished slab falls away from your house, not toward it.
  • A plain broom finish, or stamped and colored concrete if you'd like a pattern.

What happens after you call about a new driveway?

I handle the first visit and the estimate myself, and our crew does the forming, pouring and finishing with me running the work on site. Here's how a driveway job usually runs from your call to the walk-through.

  1. Call or send us a note

    Call (951) 574-0417 or use the form on this page, and tell us roughly how big the driveway is and what's wrong with the old one. We'll set a time for me to come out and look at it.

  2. I measure and write it up

    I measure, check where the water runs and look at the ground, then we talk through the finish you want. The written estimate lists each part of the job, with the digging and compacting shown before the concrete, so you can see exactly where your money goes.

  3. We prep the ground and pour

    Once you say yes, we take care of any permit steps, then our crew digs out, packs the ground, sets forms and pours. Within a quarter mile of an occupied home, Menifee allows construction only Monday through Saturday from 6:30 a.m. to 7 p.m., and Sunday or holiday work needs the city's prior approval, so we plan pour day inside those hours.

  4. Cure, clean up and walk it

    We keep the new slab from drying out too fast, clean up the site and walk the finished driveway with you. Before we leave, I'll tell you when it's ready for foot traffic and when it's ready for your car.

How we build a concrete driveway

Most of what makes a driveway last is the ground under it, so that's where the job starts. We break out the old slab, dig out all the topsoil and soft spots, and pack the subgrade, the dirt the slab sits on, or bring in granular fill and pack that, because a slab poured over loose dirt settles right along with it. Then we set the forms with a fall away from your house, place the steel, pour, and give the top a broom finish, a light brushed texture so tires and shoes grip when it's wet. Concrete cracks some, and I'll tell you that up front, so we plan for it two ways, with control joints, grooves we cut so the slab cracks along a line we chose instead of across the middle, and with rebar or wire mesh, steel that can't stop cracks but keeps them narrow when it's placed in the right spot. If the budget gets tight, the base is the last place I'd cut, because nobody sees it on day one and it's the part that decides whether the slab stays flat.

A new driveway often comes with other work at the same visit. If the backyard needs a slab too, we handle concrete patio construction with the same dig-out and packed base, and if you'd like the driveway itself to have some character, our stamped concrete services press a pattern and color into the surface while it's still soft.

  • Plain broom-finish driveway

    This suits most homes and most budgets, since the money goes into the base and the slab instead of the look. It's the plain, practical surface a lot of people want on a driveway that gets used every day.

  • Stamped or colored driveway

    This suits you if the driveway is the first thing people see and you want it to match the house. It costs more than a broom finish, and the base work matters even more under it, because a pattern shows a sunken corner fast.

  • Widened driveway or side pad

    This suits a household that has outgrown a narrow driveway or needs room for a trailer or a boat. Where the old slab is still sound, we pour the new section against it with a joint between the two.

Get a written estimate for your new driveway

Send the rough size of your driveway and a few photos of the site, and we'll reply within one business day to set a time for me to come out. The on-site estimate is free, with no obligation.

(951) 574-0417

Questions Menifee homeowners ask about new concrete driveways

These are the questions I hear most before a driveway goes in. The answers come from what concrete actually does and from the rules the city and the state set for this work.

Will a new concrete driveway crack?

Yes, some, because all concrete tends to crack and nobody can pour a slab that's completely crack-free. If a bidder promises no cracks at all, weigh that promise against what concrete actually does. What we can do is keep cracks narrow and in planned lines, with the joints and steel described above.

How much does a concrete driveway cost in Menifee?

An installed standard 4-inch concrete slab in California usually costs about $9 to $18 per square foot, and that covers materials, labor and a basic broom finish. That's the going range across the state, not our price. Where yours lands depends on the tear-out, the ground work and the finish, and your estimate puts a figure on each part.

Does Menifee require a zone clearance or inspections for concrete work?

The city says a Planning zone clearance is required even when a building permit isn't, so a job can still need the city's sign-off without a permit. When the city does issue a building permit, inspections are required at key stages and have to be approved before the final inspection. When a job needs any of it, we handle the application and set up the inspections, and we tell you before work starts.

What license should a concrete contractor have in California?

A concrete contractor should be licensed by the Contractors State License Board, whose C-8 Concrete Contractor class covers pavement and flat concrete work like driveways. The board requires a license when a project needs a building permit, uses any additional workers, or totals $1,000 or more in labor and materials. We're fully licensed and insured.

How do I compare concrete driveway bids?

Start by asking each bidder what ground work the price includes, because the whole slab rests on it, and then how they plan for cracks. The state license board's rule for home improvement projects keeps a down payment at no more than $1,000, and less on smaller contracts. Any other payments have to be listed in the contract and based on work already done or materials delivered to your home.

How long does a new concrete driveway take to cure?

Curing should start as soon as possible after the pour, and concrete industry guidance calls for a sprayed curing compound or damp burlap kept moist for at least 3 days. That keeps the surface from drying too fast and turning weak. In very hot weather, the same guidance says an early-morning pour gives better control of the concrete's temperature.

Concrete driveway building in Menifee and nearby cities

Menifee requires a grading permit for grading or dirt stockpiles on private property and an encroachment permit for work in the public right-of-way, so I check which apply before we dig. We build the same way in Murrieta and Perris.

(951) 574-0417Get an estimate